Dock house exterior dock leveller
Logistics optimization without civil works




Alapont Global’s isothermal tunnel platforms are the ultimate solution for facilities where an internal pit is not feasible. By installing the isothermal table and exterior dock house in front of the building, 100% of the interior floor space is preserved. Ideal for extensions and refurbishments, this system creates additional loading points without complex civil works.
Specifically engineered for cold-chain logistics, our custom-made loading benches and integrated dock levellers maintain thermal insulation, providing a seamless and efficient bridge between the warehouse and the vehicle.
Benefits and operational return
Superior thermal insulation
Maintains the cold chain between the warehouse and the truck, reducing temperature loss and optimizing energy consumption.
Total protection
Shields against adverse weather conditions and limits the entry of dirt, dust and external agents.
Space optimization
By externalizing the loading area, up to 10 m² of usable interior space can be gained for each installed dock.
Safety and hygiene
Eliminates the internal pit where residues often accumulate, avoiding bad odors, germs and possible pests.
Return on investment
Rapid payback thanks to sustained energy savings and improved logistics operating speed.

Download our catalog
Access all the technical and visual information on our solutions to optimise your loading area with Alapont Global.

Request a Quote
Optimize your loading area with a custom-made, efficient and fast-installation solution. Click here and we will contact you as soon as possible to assess the solution that best suits your operation.
Request a call
and we will contact you as soon as possible.


